Screen EV truck charging by address
Check whether a fast-charging stop lists heavy-duty access, then screen the parcel, roads and electric utility with Invariant Earth.
Use the U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) to identify charging stations and their reported vehicle class. Use Invariant Earth to screen the land, road network and electric utility around a proposed stop or depot. Confirm the truck route, connector, trailer layout and access with the operator before dispatch.
Check the station inventory
Look up the AFDC station record by ID. Keep status_code, access_code, restricted_access, maximum_vehicle_class, ev_connector_types and ev_dc_fast_num as separate values. AFDC’s class HD covers heavy-duty classes 7–8. A missing class leaves physical access unknown. The station’s status E means AFDC lists the facility as available. A network feed or reservation system is needed to check for an open bay.
Set AFDC_API_KEY to a National Laboratory of the Rockies developer key. This example selects the station fields used for the preliminary screen.
curl --fail-with-body --max-time 30 -sS -G \
'https://developer.nlr.gov/api/alt-fuel-stations/v1/391821.json' \
--data-urlencode "api_key=$AFDC_API_KEY" |
jq '.alt_fuel_station | {
id, station_name, status_code, access_code, restricted_access,
maximum_vehicle_class, ev_connector_types, ev_dc_fast_num,
latitude, longitude, date_last_confirmed, updated_at
}'
When you only have coordinates, use the AFDC nearest stations endpoint. Keep the unfiltered results if you want to follow up on stations with missing vehicle class. Apply maximum_vehicle_class=HD to find explicitly reported heavy-duty candidates. Keep both the record’s date_last_confirmed and the date you retrieved it.
Compare public fast charging with truck access
These three AFDC records were retrieved on November 24, 2026. Each reported public access and status E.
| Station and AFDC ID | Installed DC fast ports | Maximum vehicle class |
|---|---|---|
Pilot Travel Center 454, London, Ohio (322368) |
4 | Unreported |
TA US-42, London, Ohio (388708) |
12 | Unreported |
Greenlane Charging Center, Colton, California (391821) |
41 | Heavy-duty (HD) |
The Ohio records identify stops to investigate. Neither supplies enough evidence to route a tractor-trailer to a bay. At Colton, Greenlane’s location page lists 12 pull-through CCS chargers and 29 bobtail CCS chargers, for tractors without trailers. A driver with a trailer needs to confirm that a pull-through bay is compatible and accessible at the planned arrival time. The downloadable station records and Earth request preserve the class, connector codes and source dates.
Screen the site with Invariant Earth
First match the address to its parcel. Use the verified site coordinate for Fetch and the confirmed gate for route checks. This example uses the AFDC station point at Colton to look up the surrounding context. Save the reference file as fleet-charging-site-reference.json and set INVARIANT_API_KEY to your Earth API key.
jq -c '.earth_fetch_example.body' fleet-charging-site-reference.json |
curl --fail-with-body --max-time 75 -sS 'https://api.invariant-ai.com/v1/fetch' \
-H "X-API-Key: $INVARIANT_API_KEY" \
-H 'Content-Type: application/json' \
--data-binary @-
| Fields | Use in the screen |
|---|---|
parcel_apn, parcel_match_type |
Confirm the candidate tract and review nearby matches before attaching records to the proposed site. |
nearest_road_class, nearest_major_road_distance_m |
Locate nearby mapped roads. Verify the truck route to the gate with the equipment and trailer that will use it. |
electric_utility_service_territory, nearest_substation_distance_m |
Identify the mapped territory and nearby infrastructure. Confirm the serving utility and ask what the proposed phased load requires. |
Keep the API’s source, status and vintage with each field. For an existing station, record the operator, confirmed entrance, connector, trailer policy, and timestamp of the fleet’s booking or availability check. For a new depot, add a busy-day interval load profile, proposed service location and earliest operating date to the utility request.
See the Ohio port-count audit for counting rules and the Southern California charging study for operator-reported fleet access and lane types.