Get an API key
Workflows

Find an electric utility by address or parcel

Look up the mapped electric utility at a U.S. site, resolve territory overlaps using local sources, and confirm who can serve your project.

To find who delivers electricity to an existing building, start with the delivery utility on the bill or check the address with the utility. For vacant land or a portfolio of sites, use a service-territory map to identify who to contact. The Earth API returns one mapped utility when one distinct utility covers the coordinate. If several overlap, it reports the candidates for follow-up.

Look up the mapped utility with the API

For an address, verify the matched coordinate and check the parcel before running the lookup. For a campus beside a utility boundary, check the proposed meter or delivery point and the other parcels in the assembly. A match at one point applies to that point in the source map.

Set INVARIANT_API_KEY to your API key. The example uses an Ashburn, Virginia reference coordinate. Replace both coordinates together for your site.

curl --fail-with-body --max-time 75 -sS 'https://api.invariant-ai.com/v1/fetch' \
  -H "X-API-Key: $INVARIANT_API_KEY" \
  -H 'Content-Type: application/json' \
  --data '{
    "lat": 39.0438,
    "lng": -77.4874,
    "fields": [
      "electric_utility_service_territory",
      "electric_utility_ownership_type",
      "nearest_substation_distance_m"
    ]
  }'

Read electric_utility_service_territory first. Its source is the NTIA copy of HIFLD’s retail territories, an EIA-861-based national screening layer. Save source_url, dataset_vintage and fetched_at. A fresh response may still describe an older reporting year. electric_utility_ownership_type describes the ownership class. nearest_substation_distance_m measures proximity to a mapped substation within 10 km. Use that distance to screen geography and ask the utility which equipment it would actually use.

Territory status What to do
ok A single distinct national map match. Record the EIA utility ID, ownership and reporting year from notes. Check the utility’s own address or new-service lookup.
absent No national polygon intersects the point. Check the coordinate and parcel, then look up the local utility or regulator map. The parcel may still have service.
failed Check partial_failures. An overlap lists candidate utilities and is marked non-retryable. An upstream outage can produce the same field status. Retry an outage only when the response marks it retryable.

Compare a single match and an overlap

These dated results come from querying the public map layers directly. Use the downloadable requests and source records to repeat the checks or try both points with your key.

Reference point National map result Next check
Ashburn, VA (39.0438,-77.4874) One match, Virginia Electric & Power Co. (EIA ID 19876). Use the Virginia SCC utility directory and service map and verify the delivery point with the utility.
Downtown Austin, TX (30.2672,-97.7431) Three matches, Austin Energy (1015), Bluebonnet Electric Cooperative (1892) and Pedernales Electric Cooperative (14626). The same point intersects Austin Energy’s published service boundary, feature 641. That makes Austin Energy the first contact for address-level verification.

The national features at both points report data year 2022. In Austin, the local intersection narrows the follow-up while the national overlap remains part of the evidence. A city name or ZIP code is too coarse for parcels at a boundary. Some state filing maps are approximate. For a disputed Texas boundary, check the commission’s applicable records and ask the utility for written confirmation. PUCT guidance on service-area filings.

Confirm who can serve your project

  • Existing building. Check the current bill for the delivery utility and the meter or electric service identifier. In parts of Texas with retail choice, the company that sells electricity can differ from the company that delivers it. Oncor’s address, ESI ID and coordinate lookup is an example of a utility-level check.
  • Vacant parcel or new connection. Give the utility the parcel ID, site plan, intended delivery point and requested service date. Ask what its service-area or availability letter establishes and what additional engineering it requires. Austin Energy’s service availability request describes a local process.
  • Large new load. Include requested MW by phase, load ramp, energization dates and reliability needs. Ask for the study process, connection options, upgrades, service conditions and when the utility can commit to delivery. Record the document that supports each claim. How utility letters, load studies and service agreements differ.

For a shortlist, keep the map result, the confirmed delivery utility and the project’s power status as separate fields. Carry unresolved boundaries forward until the utility or regulator answers for the proposed delivery point. Continue with parcel, hazard and infrastructure screening.