# Check commercial roof replacement records by address

> Match an address to the insured building, then use city permit records and closeout evidence to verify the roof work and its date.

Source: https://docs.invariant-ai.com/check-roof-replacement-by-address

To check when a commercial roof was replaced, match the address to the building you mean to insure. Then look up the issuing agency's permit and completion records for that building. The work description tells you which sections are covered. A documented installation date or appropriate closeout evidence helps establish the age of the work.

## Match the building before reading its permits

Use [Verify a building by address](https://docs.invariant-ai.com/verify-building-by-address) to check the geocoded address, the footprint and the parcel. When a tax lot contains several structures, check the building identifier in the issuing agency's records. New York City uses a building identification number (BIN). The public Earth catalog's [county building permit totals](https://docs.invariant-ai.com/fields/county_building_permits_total_annual) describe activity across a county. Use the local permit system for a building's work history.

## Check which roof sections the New York City permit covers

The [DOB NOW Approved Permits dataset](https://data.cityofnewyork.us/d/rbx6-tga4) has three issuance records for two permit IDs connected to Brooklyn Army Terminal Building A. Each row uses BIN `3257059`. Query by both permit IDs to retain the original and later dates for temporary work.

```bash
curl --fail-with-body --silent --show-error --retry 2 --max-time 20 --get 'https://data.cityofnewyork.us/resource/rbx6-tga4.json' \
  --data-urlencode '$select=work_permit,bin,issued_date,work_type,job_description,permit_status' \
  --data-urlencode "\$where=work_permit in ('B01209484-I1-GC','B01301887-I1-PMM')" \
  --data-urlencode '$limit=100' \
  --data-urlencode '$order=work_permit,issued_date'
```

| Permit | Issuance in the checked records | What the city description covers |
| --- | --- | --- |
| `B01209484-I1-GC` | June 17, 2026 | Re-roofing the Building A and tank house roofs. The scope excludes the stair tower and mechanical penthouse roofs. |
| `B01301887-I1-PMM` | October 23, 2025 and October 6, 2026 | Temporary roof protection. Preserve each issuance record under the same permit ID. |

The selected rows are issuance records. For evidence of completed work, follow the permit into the [DOB building records and portal](https://www.nyc.gov/site/buildings/dob/find-building-data.page). Match the inspection, sign-off or contractor installation record to the roof sections you are reviewing.

## Check scope even when a permit says completed

Seattle's [building permit records](https://data.seattle.gov/Built-Environment/Building-Permits/76t5-zqzr/about_data) expose issue date, completion date and the current status separately. Compare three public facilities using the same fields.

```bash
curl --fail-with-body --silent --show-error --retry 2 --max-time 20 --get 'https://data.seattle.gov/resource/76t5-zqzr.json' \
  --data-urlencode '$select=permitnum,issueddate,completeddate,statuscurrent,description,originaladdress1' \
  --data-urlencode "\$where=permitnum in ('6584417-CN','6986192-CN','7163023-RR')" \
  --data-urlencode '$limit=100' \
  --data-urlencode '$order=permitnum'
```

| Building and permit | What the permit covers | Completion in the checked records |
| --- | --- | --- |
| Alki Community Center, `6584417-CN` | Re-roofing 5,400 square feet and adding fall protection anchors. | The city lists the permit as completed on March 20, 2018. That date describes the permit closeout. |
| Lemieux Library, `6986192-CN` | Alterations for rooftop telecom equipment and an equipment room. | The city lists the permit as completed on May 5, 2025. The described work concerns equipment. |
| Meadowbrook Community Center, `7163023-RR` | Re-roofing the existing community center. | The city lists the permit as issued on September 16, 2026, with no completion date in the checked row. |

Records were checked on November 25, 2026. A later query can show an updated status. The permit's completion date documents closeout of its described scope. Check installation records for the actual work date and confirm whether the scope includes all insured roof sections.

## Keep the evidence for renewal

Save the matched building identifier, permit ID, issuing authority, description and retrieval date. Keep issue, inspection, completion and installation dates in separate fields. Where completion or scope is unclear, keep roof age unknown and record the missing document. Retain the prior record when a later observation adds a date or changes the status.

- [Compare commercial property underwriting data and the source records behind it](https://invariant-ai.com/blog/commercial-property-insurance-data-apis#roof-age).
- [Check wildfire exposure for the same building](https://docs.invariant-ai.com/check-wildfire-hazard-by-address).
- [Save the source and retrieval time with an API response](https://docs.invariant-ai.com/responses).
- [Compare a permit data provider against the NYC and Seattle issuer records](https://docs.invariant-ai.com/test-building-permit-api).